Borealis – Furnace i WWT Tanks

Country: Sweden

Location: Stenungsund

Facility type: Chemical plant producing plastics (PE polyethylene) and basic chemicals.

Client: Kaefer AB

Type of work performed:

Service work at a chemical plant consisting of insulating pipelines (heat and cold insulation). Insulation works on the newly built furnace, which included insulating pipelines and channels. Works at the WWT sewage treatment plant included the insulation of 2 tanks and pipelines.

Join us